Antiadhésif végétal, Bioguard, Somavrac C.C, wagons

Industry: mining

Project: railcar spraying to avoid ore freezing and carryback when unloading

Project specifications: harsh winter conditions (northern Quebec)

Main customer challenges

  • Loss of product through ore carryback in railcars during the winter
  • Risk of derailment from the weight of railcars (ore carryback)
  • Minimizing the material and labor costs required to protect the railcars: approximately 1,500 railcars were equipped with plywood and insulation, which are short-lived, nondurable, and lose their effectiveness quickly
  • Risks to employee safety, material damage (load weight), and time loss when ore clumps together, which employees then have to break up

Solutions recommended by Somavrac C.C.

  • Semi-automated system that sprays 29.6% concentration calcium chloride on railcar walls and top (includes a flowmeter to control amount of spray)
  • Following services: ship unloading, product warehousing in customer tank (pipeline), solution preparation in the tank, and railcar transfer (using the pipeline) performed by the Somavrac C.C. team

Results and customer impact

  • Less product loss at unloading (prevents the product from clinging to railcar side walls)
  • Safe railcar travel
  • Lower costs (material and labor)
  • Simplified management: product and service included, to avoid having to deal with 2 or 3 separate suppliers.

Claim your 500 free spins and registration incentive by joining Betcoinfox casino.

Recommended Posts

No comment yet, add your voice below!


Add a Comment

Your email address will not be published. Required fields are marked *